Skip to main content

Manufacturing · Quality · Verification

Manufacturing and Compliance Verification

Review the engineering, production, quality-control and compliance evidence to request for a WanlinSBC Android board project.

Production scope

Manufacturing and assembly information for industrial Android boards and embedded SBC products.

Quality process

Review material control, inspection, testing, traceability and shipment verification.

Document verification

Confirm certifications and reports against the exact model, revision and target market.

Manufacturing and Compliance Verification

Evaluate manufacturing evidence for the project

WanlinSBC publishes information about industrial Android board and embedded SBC engineering under the Wanlin Group identity. Verify the manufacturing and quality arrangements applicable to the exact model and order rather than treating a general factory page as a certificate.

What to request

  • Current model specification, drawing and approved PCB revision.
  • Software build, programming and functional-test requirements.
  • Material traceability, inspection and nonconformance controls.
  • Test scope, acceptance records and change-notification responsibility.
  • Applicable certificates or laboratory reports identifying the applicant, model, standard and configuration.

Public document status

Model-specific certificate files are not currently offered for public download in this document center. This does not establish whether a particular product is certified. Request the controlled document for the selected configuration and destination market.

Factory management-system certification, a bare board report and final-equipment approval describe different scopes. Do not assume one covers another.

Published documents and request route · Quality process · Supplier checks · Request project evidence

Information verification

Product, manufacturing, certification and commercial information should be checked against current technical documents, the exact model or hardware revision, and written project requirements.